Plan a complete production line
Match cleaning, crushing, roasting, pressing, filtering and filling equipment.
Open page
A CO2 laser coding machine creates permanent production, batch or traceability marks on compatible non-metal packaging surfaces. Mark contrast and readability depend strongly on the substrate, coating, line speed and optical setup, so sample marking is the main selection step.
The following table is retained as the published model reference. Final performance and compatibility must be confirmed in the written quotation and acceptance specification.
| Product model | CX10 | CX30 | |
|---|---|---|---|
| Laser parameters | Laser | Sealed RF excitation imported from the United States CO2 Laser | |
| Laser wavelength | 10.6 or 10.2 μm | ||
| Average output power | 10W | 30W | |
| Modulation frequency range | 5kHz-20kHz | 5kHz-20kHz | |
| Galvanometer parameters | Maximum speed | 7000mm/s | |
| Resolution | 0.001mm | ||
| Repeat positioning accuracy | 0.003mm | ||
| Optical output characteristics | Marking range | F=160mm, range 110×110 (optional) | F=160mm, range 110×110 (optional) |
| Minimum line width | 0.1mm | 0.1mm | |
| Minimum character height | 0.4mm | 0.4mm | |
| System property | Laser power supply | AC220V/50Hz | AC220V/50Hz |
| Device input maximum power | 0.8KW | 1.1KW | |
| Device input average power | 0.5KW | 0.7KW | |
| Cooling method | Air-cooled | Air-cooled | |
| Host system dimensions | |||
| Workbench travel | 600mm | ||
| Environmental requirements | 0-35℃, humidity<90% |
Use representative samples for the factory acceptance test whenever practical. The agreed test material, run duration, sampling method and pass limits should be written into the purchase specification.
Manufacturer pricing depends on the confirmed machine configuration, format parts, controls, guarding, line interfaces, utilities and destination. Delivery schedule, export packing, installation, commissioning, training, spare parts and after-sales support apply only as stated in the written quotation and contract.
Recommended next step
Compare the right capacity, confirm the raw-material process and request a factory configuration before ordering.
Match cleaning, crushing, roasting, pressing, filtering and filling equipment.
Open page →Review preparation and pressing routes for seeds, nuts and specialty materials.
Open page →Compare price, capacity, process, operation and startup requirements.
Open page →Send the material, target output and destination for a matched factory quote.
Request quote →Review additional machine, process and buyer resources on hydraulic-oil-press.com.
Open website →